References

References

Execution

Place

Project

Client

Additional Information

2018

Büsum

Northsea, Germany

pre-tenching for sea cable installation, 10.000 m

Bohlen & Doyen

2017

Schmarren – Wurster Arm

Northsea, Germany

sea cable installation 12kV, 3400 m long, laid at a depth up to 2 m.

WSA Bremerhaven

2016

Föhr – Amrum

Lüttmoorsiel – Nordstrandischmoor

Northsea, Germany

sea cable installation 20kV, 4300 m long and 4800m long, laid at a depth up to 2 m.

Wilhelm Wähler GmbH

2015

Windfarm Gemini, Northsea, Netherland

export cable installation 245kV, 4 x 7800 m long, laid at a depth up to 6 m.

Van Oord

2013

Windfarm Northwind , Northsea, Belgium

export cable installation 245kV, 2500 m long, laid at a depth up to 6 m.

Jan De Nul

2012

Windfarm Lincs , Northsea, UK

export cable installation, 8100 m long, laid at a depth up to 6 m.

Centrica

2012

Wilhelmshaven , Northsea, Germany

sea cable installation, 1200 m long, laid at a depth up to 2 m.

ARGE Möbius/Bunte

2011

Windfarm Lincs , Northsea, UK

export cable installation, 8100 m long, laid at a depth up to 6 m.

Centrica

2010

Neuwerk, Northsea, Germany

water pipe installation, 9000 m long, laid at a depth up to 4 m.
 

Hamburg Port Authority

2009

Mains connection for Hiddensee, a German island in the Baltic Sea
2 medium high voltage cables 12/20kV each 2100 m long laid at a depth up to 3 m.

E.ON Edis

2008

Mains connection for the German oil field, Mittelplate A, located in the tidal flats of the coast of Schleswig-Holstein
2 medium high voltage cables 12/20 kV each 7500 m long laid at a depth up to 10 m.

RWE DEA