References
-
2019 MOG Zeebrügge, Belgium
Export cable Installation 220kV, 2 x 1600m long, laid at a depth up to 4m – DEME
-
2018 Windfarm Norther Zeebrügge, Belgium
Export cable Installation 220kV, 2000m long, laid at a depth up to 4m – Van Oord
-
2018 Nordlink Büsum, Germany
re-tenching for sea cable installation, 10.000 m – Bohlen & Doyen
-
2017 Schmarren – Wurster Arm Northsea, Germany
sea cable installation 12kV, 3400 m long, laid at a depth up to 2 m – WSA Bremerhaven
-
2015 Windfarm Gemini, Northsea, Netherland
export cable installation 245kV, 4 x 7800 m long, laid at a depth up to 6 m – Van Oord
-
2013 Windfarm Northwind , Northsea, Belgium
export cable installation 245kV, 2500 m long, laid at a depth up to 6 m – Jan De Nul
-
2012 Windfarm Lincs , Northsea, UK
export cable installation, 8100 m long, laid at a depth up to 6 m – Centrica
-
2012 Wilhelmshaven , Northsea, Germany
sea cable installation, 1200 m long, laid at a depth up to 2 m – ARGE Möbius/Bunte
-
2011 Windfarm Lincs , Northsea, UK
1. Exportkabel Installation 145kV mit einer Länge von 8100m in einer Tiefe bis 6m – Centrica
-
2010 Neuwerk, Northsea, Germany
water pipe installation, 9000 m long, laid at a depth up to 4 m – Hamburg Port Authority
-
2009 Mains connection for Hiddensee, a German island in the Baltic Sea
2 medium high voltage cables 12/20kV each 2100 m long laid at a depth up to 3 m – E.ON Edis
-
2008 Mains connection for the German oil field, Mittelplate A, located in the tidal flats of the coast of Schleswig-Holstein
2 medium high voltage cables 12/20 kV each 7500 m long laid at a depth up to 10 m – RWE DEA